{"id":29293,"date":"2025-12-23T16:09:37","date_gmt":"2025-12-23T15:09:37","guid":{"rendered":"https:\/\/zemaljskimuzej.ba\/?p=29293"},"modified":"2025-12-30T11:55:44","modified_gmt":"2025-12-30T10:55:44","slug":"completion-of-phase-i-of-the-fbih-environmental-protection-fund-project","status":"publish","type":"post","link":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/","title":{"rendered":"Completion of Phase I of the FBiH Environmental Protection Fund Project"},"content":{"rendered":"<p>Dear visitors, partners, and collaborators of the National Museum of Bosnia and Herzegovina,<\/p>\n<p>With the end of the current year, we have completed Phase I of the project \u201cImplementation of Works on the Landscaping of the Southern Part of the Botanical Garden of the National Museum of Bosnia and Herzegovina (Phase I)\u201d, which was co-financed by the Environmental Protection Fund of the Federation of Bosnia and Herzegovina. Through this project, basic infrastructural works were carried out in the southern part of the Botanical Garden, including the following activities: excavation of trenches and installation of water supply and irrigation pipes, as well as electricity and lighting cables; preparation and construction of walkways (ground base preparation, installation of base layers, gravel placement, and curbstone installation); construction of crushed-stone islands; construction of a pond; repair of the existing fence; renovation of the greenhouse and hotbeds, among other works. In addition to the Fund, this phase of the project was also co-financed by the Federal Ministry of Environment and Tourism, the Ministry of Civil Affairs of Bosnia and Herzegovina, and the Museum\u2019s own funds.<\/p>\n<p>Thanks to the FBiH Environmental Protection Fund, as well as other co-financiers, we are now one step closer to putting into use a previously unused part of the National Museum of Bosnia and Herzegovina\u2019s garden, and to the final completion of the Museum project as originally envisioned and designed by Karl Par\u017eik. The works will continue in 2026, and we believe that during the year the garden will be opened to the public.<\/p>\n<p>We would like to thank all participants for their cooperation and look forward to its continuation.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-29294\" src=\"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/IMG_4656-960x720.jpg\" alt=\"\" width=\"960\" height=\"720\" srcset=\"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/IMG_4656-960x720.jpg 960w, https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/IMG_4656-1920x1440.jpg 1920w, https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/IMG_4656-480x360.jpg 480w, https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/IMG_4656-768x576.jpg 768w, https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/IMG_4656-1536x1152.jpg 1536w, https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/IMG_4656-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dear visitors, partners, and collaborators of the National Museum of Bosnia and Herzegovina, With the end of the current year, we have completed Phase I of the project \u201cImplementation of Works on the Landscaping of the Southern Part of the Botanical Garden of the National Museum of Bosnia and Herzegovina (Phase I)\u201d, which was co-financed &hellip; <a href=\"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/\">Find out more<\/a><\/p>\n","protected":false},"author":5,"featured_media":29292,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-29293","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Completion of Phase I of the FBiH Environmental Protection Fund Project - Zemaljski muzej BiH<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Completion of Phase I of the FBiH Environmental Protection Fund Project - Zemaljski muzej BiH\" \/>\n<meta property=\"og:description\" content=\"Dear visitors, partners, and collaborators of the National Museum of Bosnia and Herzegovina, With the end of the current year, we have completed Phase I of the project \u201cImplementation of Works on the Landscaping of the Southern Part of the Botanical Garden of the National Museum of Bosnia and Herzegovina (Phase I)\u201d, which was co-financed &hellip; Find out more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Zemaljski muzej BiH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/zemaljskimuzej\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-23T15:09:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-30T10:55:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/DSC00765-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"lejla\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@Zemaljskimuzej\" \/>\n<meta name=\"twitter:site\" content=\"@Zemaljskimuzej\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"lejla\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/\"},\"author\":{\"name\":\"lejla\",\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/#\\\/schema\\\/person\\\/c24201eac76a1854e608ffb7788d0342\"},\"headline\":\"Completion of Phase I of the FBiH Environmental Protection Fund Project\",\"datePublished\":\"2025-12-23T15:09:37+00:00\",\"dateModified\":\"2025-12-30T10:55:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/\"},\"wordCount\":282,\"publisher\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/app\\\/uploads\\\/2025\\\/12\\\/DSC00765-scaled.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/\",\"url\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/\",\"name\":\"Completion of Phase I of the FBiH Environmental Protection Fund Project - Zemaljski muzej BiH\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/app\\\/uploads\\\/2025\\\/12\\\/DSC00765-scaled.jpg\",\"datePublished\":\"2025-12-23T15:09:37+00:00\",\"dateModified\":\"2025-12-30T10:55:44+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/app\\\/uploads\\\/2025\\\/12\\\/DSC00765-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/app\\\/uploads\\\/2025\\\/12\\\/DSC00765-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Completion of Phase I of the FBiH Environmental Protection Fund Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/\",\"name\":\"Zemaljski muzej BiH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/#organization\",\"name\":\"Zemaljski muzej BiH\",\"url\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/app\\\/uploads\\\/2025\\\/08\\\/zmbih-logo.png\",\"contentUrl\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/app\\\/uploads\\\/2025\\\/08\\\/zmbih-logo.png\",\"width\":256,\"height\":256,\"caption\":\"Zemaljski muzej BiH\"},\"image\":{\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/zemaljskimuzej\\\/\",\"https:\\\/\\\/x.com\\\/Zemaljskimuzej\",\"https:\\\/\\\/www.instagram.com\\\/zemaljskimuzej_bih\\\/\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCK-JP1rHT4wJ7MOyVcduoIg\",\"https:\\\/\\\/www.tiktok.com\\\/@zemaljskimuzejbih\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/#\\\/schema\\\/person\\\/c24201eac76a1854e608ffb7788d0342\",\"name\":\"lejla\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7a93c3123e017548b4f7bdc172b40d4db58f5171ba8790f02c29f7f7a2345cbf?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7a93c3123e017548b4f7bdc172b40d4db58f5171ba8790f02c29f7f7a2345cbf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7a93c3123e017548b4f7bdc172b40d4db58f5171ba8790f02c29f7f7a2345cbf?s=96&d=mm&r=g\",\"caption\":\"lejla\"},\"url\":\"https:\\\/\\\/zemaljskimuzej.ba\\\/en\\\/author\\\/lejlabecargmail-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Completion of Phase I of the FBiH Environmental Protection Fund Project - Zemaljski muzej BiH","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/","og_locale":"en_US","og_type":"article","og_title":"Completion of Phase I of the FBiH Environmental Protection Fund Project - Zemaljski muzej BiH","og_description":"Dear visitors, partners, and collaborators of the National Museum of Bosnia and Herzegovina, With the end of the current year, we have completed Phase I of the project \u201cImplementation of Works on the Landscaping of the Southern Part of the Botanical Garden of the National Museum of Bosnia and Herzegovina (Phase I)\u201d, which was co-financed &hellip; Find out more","og_url":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/","og_site_name":"Zemaljski muzej BiH","article_publisher":"https:\/\/www.facebook.com\/zemaljskimuzej\/","article_published_time":"2025-12-23T15:09:37+00:00","article_modified_time":"2025-12-30T10:55:44+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/DSC00765-scaled.jpg","type":"image\/jpeg"}],"author":"lejla","twitter_card":"summary_large_image","twitter_creator":"@Zemaljskimuzej","twitter_site":"@Zemaljskimuzej","twitter_misc":{"Written by":"lejla","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/#article","isPartOf":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/"},"author":{"name":"lejla","@id":"https:\/\/zemaljskimuzej.ba\/en\/#\/schema\/person\/c24201eac76a1854e608ffb7788d0342"},"headline":"Completion of Phase I of the FBiH Environmental Protection Fund Project","datePublished":"2025-12-23T15:09:37+00:00","dateModified":"2025-12-30T10:55:44+00:00","mainEntityOfPage":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/"},"wordCount":282,"publisher":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/#organization"},"image":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/#primaryimage"},"thumbnailUrl":"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/DSC00765-scaled.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/","url":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/","name":"Completion of Phase I of the FBiH Environmental Protection Fund Project - Zemaljski muzej BiH","isPartOf":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/#primaryimage"},"image":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/#primaryimage"},"thumbnailUrl":"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/DSC00765-scaled.jpg","datePublished":"2025-12-23T15:09:37+00:00","dateModified":"2025-12-30T10:55:44+00:00","breadcrumb":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/#primaryimage","url":"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/DSC00765-scaled.jpg","contentUrl":"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/12\/DSC00765-scaled.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/zemaljskimuzej.ba\/en\/completion-of-phase-i-of-the-fbih-environmental-protection-fund-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/zemaljskimuzej.ba\/en\/"},{"@type":"ListItem","position":2,"name":"Completion of Phase I of the FBiH Environmental Protection Fund Project"}]},{"@type":"WebSite","@id":"https:\/\/zemaljskimuzej.ba\/en\/#website","url":"https:\/\/zemaljskimuzej.ba\/en\/","name":"Zemaljski muzej BiH","description":"","publisher":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zemaljskimuzej.ba\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/zemaljskimuzej.ba\/en\/#organization","name":"Zemaljski muzej BiH","url":"https:\/\/zemaljskimuzej.ba\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/zemaljskimuzej.ba\/en\/#\/schema\/logo\/image\/","url":"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/08\/zmbih-logo.png","contentUrl":"https:\/\/zemaljskimuzej.ba\/app\/uploads\/2025\/08\/zmbih-logo.png","width":256,"height":256,"caption":"Zemaljski muzej BiH"},"image":{"@id":"https:\/\/zemaljskimuzej.ba\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/zemaljskimuzej\/","https:\/\/x.com\/Zemaljskimuzej","https:\/\/www.instagram.com\/zemaljskimuzej_bih\/","https:\/\/www.youtube.com\/channel\/UCK-JP1rHT4wJ7MOyVcduoIg","https:\/\/www.tiktok.com\/@zemaljskimuzejbih"]},{"@type":"Person","@id":"https:\/\/zemaljskimuzej.ba\/en\/#\/schema\/person\/c24201eac76a1854e608ffb7788d0342","name":"lejla","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7a93c3123e017548b4f7bdc172b40d4db58f5171ba8790f02c29f7f7a2345cbf?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7a93c3123e017548b4f7bdc172b40d4db58f5171ba8790f02c29f7f7a2345cbf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7a93c3123e017548b4f7bdc172b40d4db58f5171ba8790f02c29f7f7a2345cbf?s=96&d=mm&r=g","caption":"lejla"},"url":"https:\/\/zemaljskimuzej.ba\/en\/author\/lejlabecargmail-com\/"}]}},"_links":{"self":[{"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/posts\/29293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/comments?post=29293"}],"version-history":[{"count":2,"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/posts\/29293\/revisions"}],"predecessor-version":[{"id":29296,"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/posts\/29293\/revisions\/29296"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/media\/29292"}],"wp:attachment":[{"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/media?parent=29293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/categories?post=29293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zemaljskimuzej.ba\/en\/wp-json\/wp\/v2\/tags?post=29293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}